17 APRIL 2018
ZapSibNeftekhim status update, March 2018
A total 9,364 Russian construction workers on site.
A total 1,059 construction machines on site.
25 JANUARY 2018
Construction and installation completed at ZapSibNeftekhim’s main power substations
Construction and installation work has been completed for the central 500/110 kV distribution substation and primary step-down transmission substations Nos. 1 and 2 at the ZapSibNeftekhim deep hydrocarbon conversion complex.
15 DECEMBER 2017
ZapSibNeftekhim building a closed-loop water system
Saline sewage evaporator, part of the closed-loop water system, is being installed at ZapSibNeftekhim.
11 DECEMBER 2017
ZapSibNeftekhim’s prospective customers get introduced to the new plant’s product range
ZapSibNeftekhim’s product range and transport logistics were the main topics discussed at a two-day client event hosted by SIBUR in Tobolsk, which attracted about 50 existing and potential customers of SIBUR from various segments of the Russian market for polyolefin processing.
19 OCTOBER 2017
Large-size equipment delivery and unloading completed for ZapSibNeftekhim within the summer – autumn 2017 navigation season
During 2017, 305 items of large-size equipment for ZapSibNeftekhim deep hydrocarbon conversion complex were delivered to the industrial port of Tobolsk.
29 SEPTEMBER 2017
Tanks installed at ZapSibNeftekhim
Tanks of up to 200 cubic metres each have been delivered and installed at the ZapSibNeftekhim site. The tanks were made of both high-grade stainless steel and carbon steel, can bear significant loads, resist deformation, and are corrosion-resistant. The stainless steel tanks are chemically inert and do not react with the substances placed inside them.
23 AUGUST 2017
Installation of spherical tanks commences at ZapSibNeftekhim
Installation of spherical tanks has started at the ZapSibNeftekhim complex for interim storage of liquefied petroleum gas (butadiene). The spherical tanks were manufactured and supplied by the Yekaterinburg-based Uralkhimmash plant.
07 AUGUST 2017
First batch of unique large-size equipment for ZapSibNeftekhim arrives at the industrial port of Tobolsk
A new batch of large-size equipment for ZapSibNeftekhim deep hydrocarbon conversion complex has been delivered to the industrial port of Tobolsk.
19 JULY 2017
ZapSibNeftekhim receives first delivery of Russian-made high-voltage transformers
Russia’s producer Power Machines – Toshiba. High-Voltage Transformers has completed the manufacture of four high-voltage autotransformers for the ZapSibNeftekhim complex currently under construction.
18 JULY 2017
Installation of polypropylene storage silos commences at ZapSibNeftekhim’s logistics platform
Silos are being installed as part of the ZapSibNeftekhim logistics platform project. They will be used for interim storage of the facility’s finished products, polypropylene granules, prior to packaging. A total of 26 employees and 3 special machines are involved in the installation of the silos, each 24 metres long, 9 metres in diameter, and weighing 19 tonnes.