Growth projects

Projects news

25 MARCH 2019
New DOTP facility at SIBUR’s Perm site makes first pilot shipment to customers
The Perm facility is 100% ready for commissioning, with the first batch of dioctyl terephthalate coming off the line and shipped to customers as part of the pre-commissioning pilot.
13 MARCH 2019
ZapSibNeftekhim's polypropylene unit produces first granules
The polypropylene unit at ZapSibNeftekhim, a deep hydrocarbon conversion plant under construction, is 99.8% complete. Construction and installation works on the process unit are over, and commissioning is underway. In particular, systems are undergoing functional testing and safety systems are being checked for proper performance.
12 FEBRUARY 2019
SIBUR to improve polybutadiene rubber production efficiency in Voronezh
A 13 ktpa capacity ramp-up will increase total capacity to 48 ktpa and enable the Company to meet the strong demand for Nd-BR in the target markets of the CIS and Europe.
29 NOVEMBER 2018
Biological treatment facilities launched at SIBUR's Perm site
Maxim Reshetnikov, Perm Territory Governor, and Dmitry Konov, Chairman of the Management Board of SIBUR Holding, launched biological treatment facilities at SIBUR-Khimprom
10 OCTOBER 2018
Demineralised water unit at ZapSibNeftekhim ready for commissioning
ZapSibNeftekhim has prepared its demineralised water unit for commissioning. It is a two-stage reverse osmosis and electric deionisation plant with a total capacity of 244 cu m per hour.
17 SEPTEMBER 2018
SIBUR’s Voronezh site to ramp up production of thermoplastic elastomers used in road construction, roof coating production and other industries
SIBUR’s Voronezh site will boost the output of thermoplastic elastomers (TPE) used in road construction, roof coating production and other industries by 50 ktpa. The project has been approved by Russia’s General Board of State Expert Review (Glavgosexpertiza) and the Company’s Investment Committee.
27 AUGUST 2018
SIBUR’s site in Perm commences installation of process equipment at a new production facility
The Company’s Perm site has completed installation of two reactors at the dioctyl terephthalate (DOTP) production facility which is currently under construction.
24 AUGUST 2018
SIBUR starts installation of large-size equipment at Blagoveshchensk site
SIBUR has commenced the large-size equipment installation as part of the terephthalic acid production upgrade at the POLIEF Blagoveshchensk site. The project aims to expand its annual production capacity to 350,000 tonnes, while also improving production efficiency and environmental safety.
09 JULY 2018
New Cryogenmash station delivers the first batch of industrial gases to ZapSibNeftekhim
SIBUR has celebrated the first supply of industrial gases from Cryogenmash's new station to ZapSibNeftekhim, Russia's largest petrochemical facility under construction in Tobolsk.
25 MAY 2018
SIBUR and Gazprom sign final agreement to supply ethane to Amur GCC
The document provides more details on the basic terms and conditions of a previously signed preliminary agreement for the future 20-year ethane fraction supplies from Gazprom’s Amur Gas Processing Plant (GPP) to SIBUR's Amur Gas Chemical Complex (GCC).